Saturday, March 29, 2008


Fishermen gathered on both sides of the Lake for the first day of trout season. It was a very cold day the the best place to get a bite was the Clubhouse where the Sweet Arrow lake Conservation Association served breakfast.

The evening before, Peggy Hentz of Red Creek Wildlife Center presented a program on owl rehabilitaion to a standing room only crowd. A release of rehabilitated owls followed.
Posted by Picasa

Wednesday, March 05, 2008


On March 5th, 2008 a high water event tested the stream improvement work done below the falls. It appears that the work solved the problems.
Posted by Picasa

Saturday, February 02, 2008

On February 2nd, 2008, a large crowd gathered to celebrate Groundhog day at the Clubhouse. The featured prognosticator was Grover from the Pine Grove Grundsow Lodge. The event was sponsored by the Sweet Arrow Lake Conservation Association. Music and fellowship followed the ceremony and pot pie lunch.


Posted by Picasa

Friday, December 07, 2007


The paving was completed and a new playground installed just in time for the first significant snowfall of 2007.
Posted by Picasa

Wednesday, December 05, 2007


In October and November of 2007, the falls were "turned off" to allow re-construction of the streambanks below the falls. The flood of 1973 (hurricane Agnes) began the erosion process and it has continued ever since washing hundreds of tons of soil downstream. The rock lined channel, "root wad" deflectors and other steam improvements assure that the stream will remain within the channel and provide fish habitat as well.

Posted by Picasa

Monday, November 12, 2007


Over 100 post were used to create underwater fish habitat. This occured during a scheduled drawdown of the lake.
Posted by Picasa

Saturday, November 10, 2007


The PCC Crew continued it's work on the boardwalk. A jackhammer was the solution to suborn rock that needed to be removed to widen the trail.
Posted by Picasa

Wednesday, November 07, 2007


Several rain gardens were added to absorb storm water runoff and return it to the water table.
Posted by Picasa

Wednesday, October 17, 2007


A new and improved Clubhouse Road begins to take shape.
Note the use of infiltration trenches.
Posted by Picasa

Thursday, October 11, 2007



The Schuylkill Technology/Schuylkill Builders Association Gazebo was dedicated and the Schuylkill Leadership pavilion was also dedicated on 10/11/07
Posted by Picasa

Monday, October 08, 2007


Conduit for new parking lot lighting was installed, the storage shed was hauled to it's new location, disturbed land was seeded and mulched.
Road drainage made use of the practice called infiltration trenches to absorb water rather than run it off the road into a culvert.

Posted by Picasa

Saturday, September 15, 2007


The PCC Crew began work on the boardwalk to the falls. The parking lots began to take shape. The front porch is stronger, safer and looks better too.

Posted by Picasa

Monday, September 10, 2007

In August 2007, work began on the major renovations to the Park. Clubhouse Road and the front porch were rebuilt.

Posted by Picasa

Friday, June 15, 2007










In June, 2007 the Schuylkill Technology Center under carpentry instructor, Tim McGinley, furnished the Park with a beautiful Gazebo.
Special thanks also to the Schuylkill Builders Association for providing materials.